News

Dakre Operation Handover

Dakre Hydropower Project is built in Ba To district, Quang Ngai province and Kon Plong district - Kontum province. With a design capacity of 60MW, when the plant produces electricity, it will connect to the national grid with an estimated average annual electricity output of 126.6 million kWh.
 
Yen Linh Hydraulics Co., Ltd. is honored to be chosen as the contractor to provide the hydraulic system for lifting and lowering the spillway valve gate and water intake gate. With our best efforts and working for prestige and quality, in March 2019 the hydraulic system was handed over at the project.
Other news