News

Cai Lon culvert acceptance

On September 4, 2020, Yen Linh Hydraulics Co., Ltd. accepted the electro-hydraulic system controlling the hydraulic cylinder to raise and lower the sluice valve doors and locks of the Cai Lon Culvert project.
 
The project was built under the Cai Lon river bed, with a total length of 470 meters, including 11 sewer compartments of 40 meters wide each, with threshold elevation -3.5 to -6.5m. There is a traffic bridge on the culvert. The two locks are 15 meters wide each, threshold height -5 meters, going in opposite directions.



Other news