Nha Trang Salinity Prevention Dam
The Cai River in Nha Trang has a saltwater prevention dam that includes a 400-meter long traffic bridge. This project features a reinforced concrete pillar dam with five compartments that are 30 meters wide. The dam uses two-panel flat valve gates made of high-strength steel to prevent saltwater from entering the river S355. On the right river bank, there are boat locks that consist of a 67-meter long and 7-meter wide reinforced concrete structure with a two-way automatic ship lock gate.
Yen Linh Hydraulics Co., Ltd. is proud to have provided the hydraulic system to lift and lower the gates of the project.
Yen Linh Hydraulics Co., Ltd. is proud to have provided the hydraulic system to lift and lower the gates of the project.
Other project