Hydropower Projects

Bao Lac B lifting machine

Bao Lac B Hydropower Plant is built on Gam River in Bao Toan commune, Bao Lac district, with an installed capacity of 18 MW and is expected to provide a significant amount of electricity to the National grid system.
 
With 20 years of experience in the hydraulic industry, Yen Linh Hydraulics Co., Ltd. was chosen as the supplier of the hydraulic system that controls the valve door lifting cylinder, contributing to the success of the project.
Other project