Hydropower Projects

Mun Chung 2 Hydropower

Mun Chung 2 Hydropower Plant is an energy project - level III, built in Huyen Tuan Giao, Dien Bien with an installed capacity of 9MW, 02 units.
 
The valve's lifting and lowering hydraulic system is manufactured by Yen Linh Hydraulics Co., Ltd. in Vietnam with components and equipment imported from EU/G7 complete units within a 20-day production time.