Mun Chung 2 Hydropower
Mun Chung 2 Hydropower Plant is an energy project - level III, built in Huyen Tuan Giao, Dien Bien with an installed capacity of 9MW, 02 units.
The valve's lifting and lowering hydraulic system is manufactured by Yen Linh Hydraulics Co., Ltd. in Vietnam with components and equipment imported from EU/G7 complete units within a 20-day production time.
The valve's lifting and lowering hydraulic system is manufactured by Yen Linh Hydraulics Co., Ltd. in Vietnam with components and equipment imported from EU/G7 complete units within a 20-day production time.
Other project