Hydropower Projects

Dong Nai 1 Hydropower Plant

Dong Nai 1 Hydropower Project built in Lam Ha district and Di Linh district, Lam Dong has an installed capacity of 15MW, the average annual electricity output of the plant reaches 53.61 million kWh. The valve door lifting hydraulic system is manufactured, installed and technology transferred by Yen Linh Hydraulics Co., Ltd. and completed in 2021.



Other project