Hydropower Projects

Tr'Hy Hydropower

Tr'hy hydroelectric project is implemented on Ta Puc stream, upstream of Bung river. The project has an installed capacity of 30MW, the total area of ​​the Tr'hy hydroelectric project is more than 1.3 million m2, of which the lake bed area is 948,777m2.
 
The hydraulic lifting system for lifting and lowering 02 bow valve gates with a lifting force of 01 cylinder of 75 tons, 5.6m travel was completed by Yen Linh Hydraulics Co., Ltd., and handed over for use in 2021.
Other project