Nam Hoa 1 Lifting machine
Nam Hoa 1 Hydropower Plant
Built in Muong Bam commune - Thuan Chau District - Son La Province, with installed capacity of 18 MW, annual electricity output of 69.65x106Kwh
The Nam Hoa 1 Hydropower Plant valve lifting and lowering system was manufactured and accepted by Yen Linh Hydraulics Company in April 2020.
The lifting system has the following parameters:
Supply valve hydraulic system
Hydraulic Cylinders:
320/180-6,800 mm
Test pressure: 256 bar
Door lifting speed: 0.5m/min
Door lowering speed: 1m/min
Hydraulic power station: 30kw – 47 cc – 250 bar
Water intake hydraulic system
Hydraulic Cylinders:
280/180-4,100 mm
Test pressure: 215 bar
Door lifting speed: 0.61 m/min
Door lowering speed: 0.65 m/min
Hydraulic power station: 11kw – 19 cc – 250 bar
Built in Muong Bam commune - Thuan Chau District - Son La Province, with installed capacity of 18 MW, annual electricity output of 69.65x106Kwh
The Nam Hoa 1 Hydropower Plant valve lifting and lowering system was manufactured and accepted by Yen Linh Hydraulics Company in April 2020.
The lifting system has the following parameters:
Supply valve hydraulic system
Hydraulic Cylinders:
320/180-6,800 mm
Test pressure: 256 bar
Door lifting speed: 0.5m/min
Door lowering speed: 1m/min
Hydraulic power station: 30kw – 47 cc – 250 bar
Water intake hydraulic system
Hydraulic Cylinders:
280/180-4,100 mm
Test pressure: 215 bar
Door lifting speed: 0.61 m/min
Door lowering speed: 0.65 m/min
Hydraulic power station: 11kw – 19 cc – 250 bar