Tan Loc Hydropower
Tan Loc hydroelectric plant was built in Village 4, Tan Lac commune, Bao Lam district, Lam Dong province with an installed capacity of 12.4 MW (including 2 units, each unit has 6.2 MW). Yen Linh Hydraulics Co., Ltd. is very honored to be selected as the unit that manufactures, supplies and installs hydraulic valve lift machines.
Other project