Hydropower Projects

Tan Loc Hydropower

Tan Loc hydroelectric plant was built in Village 4, Tan Lac commune, Bao Lam district, Lam Dong province with an installed capacity of 12.4 MW (including 2 units, each unit has 6.2 MW). Yen Linh Hydraulics Co., Ltd. is very honored to be selected as the unit that manufactures, supplies and installs hydraulic valve lift machines.

Other project